Vulcan AI locates, vets and packages existing buildings and land with real electrical capacity and fiber, then delivers everything an operator needs to turn them into liquid cooled AI data centers in about 12 months, not 36.
Drag to turn. Click to strike.
The problem
Demand for AI compute is outrunning the grid. A new interconnection can take years to arrive. A building that already has a live feed is worth more than the shell around it.
US primary market vacancy, a record low (CBRE, H1 2026).
of the 7.5 GW now under construction is already preleased.
per MW for powered land in primary markets, up 51% in a year (Cushman & Wakefield).
typical wait for a large grid connection in the busiest US grid regions.
Third party estimates, cited on the Sources slide. Hyperscaler capital spending for 2026 is reported at roughly $720 to $740 billion.
The clock
The founder has worked with build firms that delivered a fully functioning data center in 12 months, start to finish. It works only when every task is planned before the first permit is filed.
Rent uses $170 per kW per month, inside the $160 to $185 range CBRE reports for 10 MW and larger requirements in Northern Virginia and Atlanta (H1 2026), on a fully leased 50 MW hall. It is an example of what waiting costs, not a forecast.
The thesis, on the map
Coal plants, smelters, paper mills and even shopping malls already hold what is scarcest in the country: wired power, big roofs and fiber nearby. Industrial sites lead because transmission is already on the property. Tap a site to see what each one proves, and what it does not.
Malls bring big floor plates, parking fields for substations and generators, and nearby utility corridors. Each site shows its status honestly: operating, planned or only proposed. About 120 US coal plants are scheduled to retire in the next five years.
What Vulcan does
Interactive
Powered land benchmark at this capacity
$0
Benchmark is $584K per MW for primary markets, so secondary markets price lower. An illustration of the screen Vulcan applies. Weights: power 26, sources 18, permits 16, fiber 12, community 12, labor 8, land price 8.
How we search
Vulcan connects to vendor data feeds through their APIs, so no single listing source decides what we see. The AI toolkit merges them, scores every property and hands a person a short list.
Commercial property, ownership, size, price, broker and owner contacts.
Substations, transmission voltage, utility territories, fiber routes and carrier density.
Zoning, permit history, council minutes, state restrictions, grants and tax incentives.
Interactive
The first requirement of a data center is multiple forms of electricity: two separate utilities and on-site turbine generators. Switching must be seamless. Click a source to fail it.
3 of 3 sources
Operations add a written procedure and 24 hour monitoring that rehearses switching between all sources, so continuity is practiced, not assumed.
Interactive
A 250 MW campus splits into five 50 MW halls: two for anchor clients, two for smaller clients and one flexible hall for liquid cooled AI training capacity. Click a hall to change what it holds.
Annual rent
$0
Leased
0%
Mix
-
Defaults sit inside CBRE's H1 2026 asking rates for large deployments: $160 to $185 per kW per month for 10 MW and up in Northern Virginia and Atlanta, and $200 to $275 in Silicon Valley. Smaller deployments price higher. Most of a campus should be under contract before opening, so the sales lead starts six months ahead.
The honest part
Record low vacancy. Tenants are waiting for space.
Reported hyperscaler capital spending in 2026.
A 2025 order speeds permitting for projects over 100 MW and opens federal land.
of projects blocked or delayed by local opposition in the first half of 2026, from one tracker.
Several states have paused or repealed data center tax incentives this year.
for new large grid connections, which is why a live feed is worth so much.
Sites with a live interconnect skip the longest queue. The search covers all 48 contiguous states.
Study the city, its leaders and its building department before an offer. Land price and permit path are negotiated together.
Tax revenue, hiring and vendor spend documented per site. Objections heard in person, recorded and answered. Local labor proven before we commit.
Opposition and incentive figures come from trackers and press reports and vary by method. See Sources.
Interactive
Air cooling is commonly cited as impractical above roughly 30 to 40 kW per rack. Rack scale AI systems draw on the order of 120 kW or more.
Air cooled
$0
Liquid cooled
$0
$0
PUE is total facility power divided by IT power. Uptime's 2026 survey puts the industry average at 1.52. Liquid cooled designs are reported at 1.10 to 1.20 by secondary sources, so treat 1.15 as a design target. Default price is the 2025 US average industrial rate, 8.62 cents per kWh (EIA).
The menu
Research, government, permits, community leaders and local resources, delivered as one site package.
Vetted design partners who have drawn liquid cooled, high density halls.
Contractors proven in the site's own market, checked against the local building department.
A schedule, a Gantt chart and named owners for every task, kept honest against the 12 month goal.
Diesel, propane, natural gas or jet fuel turbine generators sized to the load and the fuel available on site.
Introductions to capital companies that fund data centers, supported by a complete site package.
Firewalls, fiber switches, UPS units, PDUs, RPPs, server racks and the rest of the supporting hardware.
Marketing during and after the remodel so anchor and smaller tenants are lined up before opening.
Sourcing liquid cooled GPU servers from vendor partners, matched to each hall\'s power and cooling design.
Leasing server space, reselling electricity and internet and running a remote hands department.
Interactive
Market inputs are benchmarks with sources. Vulcan's own percentages are pricing assumptions you can play with.
Deal size
Market benchmarks (Cushman & Wakefield, 2026)
Vulcan pricing (assumptions)
Annual Vulcan revenue under these inputs
$0
Land value placed
$0
Build value managed
$0
An illustration, not a forecast. Powered land averaged $584K per MW in primary markets in 2026 and all-in greenfield build cost averages $17.6M per MW, excluding chips and GPUs. Secondary markets price lower. Fee shares are Vulcan's assumptions, not market rates.
The plan
An LLC, C corporation or holding company to run site analysis.
Officers, base employees, job descriptions and work tasks.
A project schedule with resourced tasks and a Gantt chart to track completion.
A high value sales lead with data center industry contacts. Jon works beside them with his own network.
Move through each phase of the project schedule, locate to package to hand off.
Ready for loan brokers and buyers, with permits bought and relationships in place.
The operator
Jon Moen is the former US technical director of a leading liquid cooling manufacturer. He has worked on more than 50 data centers and sold $500,000 liquid cooled GPU servers to MIT, Cornell, CrowdStrike, the US Navy and NATO.
in the industry
data centers
per liquid cooled server sold

Use of funds
Amounts are set with the partners we bring in. These are the categories, in the order we spend them.
Data feed access, research hardware and software, and fees to locate prime industrial sites.
Travel, lodging and meals for site visits, inspections and meetings.
Contract advisory, local counsel, specialized building permit attorneys and permit fees.
Engagement with local, state and federal programs, incentives and legislation.
Contract labor first, then salaries as sites move into packaging.
Brokerage fees, specialist consulting and contingency.
Talk to Jon about a site, a partnership or a first conversation with a lender.
Sources
This briefing is confidential and meant for the person it was sent to. It is not an offer to sell securities. Figures marked illustrative are assumptions you can change, not forecasts. Third party figures are cited, not independently audited, and reflect reports available on 16 November 2026. Vulcan AI is an advisory and packaging company. It does not guarantee permits, financing or tenants.